Fibers were tested in fixed locations on the RTM. To ensure that things are working as expected from this table, they should be placed in the same locations on the RTM according to the 2021 mapping.

FiberStatus
AOK
BOK
COK
DOK
E
F
G
H

QA of Flange Board ↔ FE0Bs

FEBFlange Board (HW)Flange ChannelI At Boot (AnaN, AnaP, Digi)I Mod ONI Mod ON + ConfigCtrl Ch
(dpm / ch)
(1 is top cob)
Fiber (ctrl / Data)

jTag OK

Feb AddressComment
L0-1t220.242 - 1.212 - 1.250

0 / 3D / HY0
L2-3t300.256 - 1.248 - 1.239

0 / 8D / HY2
L5t000.236 - 1.216 - 1.2870.272 - 2.101 - 1.3340.271 - 2.715 - 1.3341 / 5A / EY6
L6t010.249 - 1.222 - 1.3620.313 - 2.743 - 1.4340.308 - 3.539 - 1.4341 / 4A / EY8
L4b ( In EPICS is L4t)210.248 - 1.241 - 1.248

0 / 4C / GY5Hybrid 1 and Hybrid 3 give check transaction errors at the power up. Those correspond to Ly6 hybrids in the test setup.
L4t ( In EPICS is L4b)100.252 1.153 1.3740.307 - 2.8755 - 1.4480.304 - 3.564 - 1.4491 / 8B / FY4
L5b110.246 - 1.169 - 1.2430.306 - 2.242 - 1.3460.302 - 3.063 - 1.3211 / 7B / FY7Weird analog current readings.
L6b120.248-1.199-1.2780.307 - 2.705 -1.3450.304 - 3.525 - 1.3481 / 6B / FY9
L0-1b200.241 - 1.284 - 1.313

0 / 5C / GY1
L2-3b310.248 - 1.122 - 1.195

0 / 7D / HY3
  • No labels