Introduction

Feedback systems are to be prototyped in Matlab for the first commissioning of the LCLS system in early 2007.   There are six feedback systems to be tested in the first commissioning run.  They are:

  • Bunch Charge
  • DL1 Energy
  • Energy at the Spec. Dump
  • DL1 Energy + BC1 Energy + Bunch Length
  • Injector Launch
  • RF phase of Transverse Deflecting Cavity

References

Requirements and Design

User Guides

Schedule