Hybrid Results

Hybrid #

Received

Passive Components Loaded / Cleaned

Sent to UCSC

HV Test

APV25s Loaded

Wirebonded

Tested

Results

Sent to SLAC

Notes

0

02/2018

02/2018 (LS)

12/19/2018 (CB)

 

12/19/2018 (FM)

01/16/2019 (FM)


 

01/16/2019 (CB)

 

102/24/201902/25/2019 (CB)02/26/2019 (CB)   03/01/2019 (AS) UCSC 03/01/2019 (CB) 
202/25/201902/25/2019 (CB)02/26/2019 (CB)   03/01/2019 (AS) UCSC 03/01/2019 (CB) 
302/27/201902/28/2019 (CB)03/01/2019 (CB)03/04/2019 (AS)    UCSC  HV test passed. Low-Voltage Test FAILED. See Results.
402/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/05/2019 (FM)03/05/2019 (AS) UCSC   
502/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/05/2019 (FM)03/06/2019 (AS) UCSC   
602/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/05/2019 (FM)03/06/2019 (AS) UCSC  

Failed configuration. DVDD: 1.38V, 2.0A.

Needs investigating.

702/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/06/2019 (FM)03/06/2019 (AS) UCSC   
802/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/06/2019 (FM)03/06/2019 (AS)

UCSC

 

  
902/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/06/2019 (FM) 

UCSC

 

  
1002/27/201902/28/2019 (CB)03/01/2019 (CB)03/01/2019 (AS)03/04/2019 (FM)03/06/2019 (FM)  UCSC   