Hybrid #

Received

Passive Components Loaded / Cleaned

Sent to UCSC

HV Test

APV25s Loaded

Wirebonded

Tested

Results

Sent to SLAC

Notes

0

02/2018

02/2018 (LS)

12/19/2018 (CB)

 

12/19/2018 (FM)

01/16/2019 (FM)

 -

-

01/16/2019 (CB)

 

1 02/25/201902/26/2019 (CB)       
2 02/25/201902/26/2019 (CB)       
3          
4          
5          
6          
7          
8          
9          
10          
11          
12          
13          
14          
15          
16          