You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Documentation:

HPS Beamline Commission Document v1 October 20, 2014  HPS beamline commissioning document v1.0.docx

Beamline Alignment with magnets at 95in. separation:beamline_Mar032014.pptx

Beam trajectory through pair spectrometer magnet , from simulation.

Engineering drawings of beamline and components: https://userweb.jlab.org/~zarecky/Dark%20Matter%20file%20directory.htm

7/26/2011 slides from Stepan including plan and survey positions of vacuum chamber: BeamLine_updates.pptx

Beamline photos are available: Beamline.pptx

See Calorimeter for ECal-specific docs.

Presentation of Beamline update at Wednesday morning, 27 March 2013, meeting Beamline 27 March 2013.ppt

ECal vacuum flangebeam gap vacuum chamberhoneycomb

Papers:

Talks:

Subtopics:

  • No labels