Logbook

2015-02-05

Unpacking, prepping EEL clean room space.

2015-02-06

SVT box installed. Ready to install U-channels.

LV and HV cables unpacked and run from MPOD to flange. LV cables ohmed out at MPOD end with FEB

FEB chiller connected to manifold and tested.

Got ATCA crate from hall.

2015-02-07

 