You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 21 Next »

HPS 2014 SVT Group C Setup

All operations are from hpstracker in group C. 

Operation

!!! Remember to make sure the detector is being cooled. !!!

!!! Remember to make sure the interlocks are in the state you want them. !!!

SVT EPICS Power Instructions

Basic instructions to take a pedestal run with CODA

To be added.

 

 

MPOD Power Map

Table as of 11/17/2014 

GUI FEB IDPhysical FEBStatusComment
0L1t

OK

 
1

L2-3t

OK 
2L5tOK 
3L6tOK 
4L4tOKThese should be checked!
5L4bOK
6L5bOK 
7L6bDIG bad (Y-cable problem?) 
8L2-3bOK 
9L1bShort on AVDD? 
GUI Flange IDPhysical Flange BoardStatus
01 (top)OK
12OK
23OK
34 (bottom)OK

 

 

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./pgpcard_load


 

OLD: Take a calibration run with expert SVT GUI

 

Start the DAQ:

 

$ cd /u1/software/software_new

 

$ source setup_env.csh

 

$ ./bin/frontEndTestGui

 

Click <read status> and make sure no error is seen. If so, check that the FEB is powered correctly.

 

Make sure the AxiXadc temperature is ok (50-60C).

 

Configure with config/FrontEndBoardConfigC01.xml

 

Click <read status> and check that more registers are found.

 

Turn on power to hybrids (see below)

 

Do a hard reset under commands/FebCore/HybridHardReset (current on AVDDP should drop ~100mA).

 

Click <Write config>.

 

Do a soft reset under commands/FebCore/HybridSoftReset.

 

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

 


 

Test Run SVT Group C Setup

 

Group C SVT test setup

 


 

  • No labels