Description | When | Assigned |
---|---|---|
FEB power on sequence | 12/1/2014 | Hovanes |
FEB channel interlock based on current trips | 11/21/14 | Sho |
Flange "all" switch needs to turn on all four channels | 11/21/14 | Pelle |
Add power on all FEBs buttons (DVDD,AVDDP,AVDDN) | 11/21/14 | Pelle |
Description | When | Assigned |
---|---|---|
Sync EPICS GUI switch with xml Idea:
Would this be acceptable from operation standpoint? Step 2 is a little tricky and might need some tricky work on the DB... | 12/10/2014 | Pelle/Sho |
Flange "all" switch needs to turn on all four channels | 11/21/14 | Pelle |
Add hybrid Temp2 to monitoring GUI | 12/5/15 | Pelle |