You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 20 Next »

SVT DAQ EPICS control

SVT EPICS Instructions

SVT DAQ channel map

Link to excel file.




Notes
6/24/14

 

  • Alarm handler
    • Add two hybrid temperature and the front end board temperature to alarm handler. 
       
  • Front End power supply GUI:
    • Can we add a button at the top that turns ALL ON/OFF?
    • Also we might want to make a GUI that has only monitoring and ON/OFF and small expert GUI’s for each FE board where we can set voltages? Similar to for the hybrid.
    • Can we link the ALL ON/OFF so that ANAN and ANAP is turned on at the same time followed by DIG  (not exact delay is not critical). 
    • The individual “LV ON/OFF” shouldn’t be linked together.
  • Main Status GUI:
    • During stable running I think it make sense that a shifter has this as a kind of main as it is the most directly linked with the modules. 
    • If we want it to control the full system (i.e. the capability to power the whole SVT from scratch) we should probably add (from the top going down if possible on the GUI)
      • Flange board power button
      • Front End board Power button
    • I don’t know if need to control everything from this GUI, in my instructions I ask people to find the individual GUI’s and power from there but I thought I’d bring it up for feedback. The links to the individual GUIs might be ok if you ask me. 
    • There is a “SVT ALL ON/OFF” at the top. What is that doing? I think it would turn on all the “Front End” since they are powered directly from MPODs? Anyway I would remove it as powering the FE and Flange is equally important and actually the FEB will not respond without Flange power. 
    • I think we don’t need the set point for bias on this GUI since we are, at the moment, not expecting to turn it on/off from here?

 

  • No labels