Test Run SVT Group C Setup

Group C SVT test setup

HPS 2014 SVT Group C Setup

All operations are from hpstracker in group C. 

Operation

Connect the FEB and hybrid(s). Turn on the power to the FEB (see below for instructions).

Take a calibration run

Setup the DAQ:

$ cd /u1

ppa-pc88427 /u1/software/software_new$ source setup_env.

setup_env.csh~* setup_env.csh*  

ppa-pc88427 /u1/software/software_new$ source setup_env.csh

ppa-pc88427 /u1/software/software_new$ 

 

FEB Power using Keithley

TBF

FEB Power using MPOD with EPICS

N/A

Hybrid Power Control Using SVT Expert GUI

  1. Power the FEB

Hybrid Power using EPICS