Item/Tasksub-item/taskDatesComment
FEB
 
  
 layout

Done 8/4

 
 fabrication8/6-8/12 
 loading8/13-8/20 
 testing8/21- 
L4-6 Half-module production   
 apv25 loading8/7 
 hybrid & sensor QA8/12 
 half-module production incl. QA8/19-8/29When Tim is back.
L1-3 Module assembly   
    
    
    

 5. Module assembly L1-3 6. Module assembly L4-6 7. Survey--modules, u-channels, overall  overview and procedures needed 8. Mech assembly dry run 9. Motion control system check 10. inner cables-- layout, assembly,  and test 11. meazzanine boards--layout, fab, load, test 12. target--design, fab, check 13. wires--design, fab, check 14. flange cards 15. outer power cables 16. Chiller and cooling system checkout 17. PS checkout 18. Shipping boxes