Agenda:
- Update on beam line installation - François
no report 
- SVT Wire Frame - (Takashi)
Takashi presented the SVT Wire Frame. 
 
- Are there other beam line procedure documents required (besides the "Beam on Initially" procedures)? 
no discussion
- Are the survey requirements for the beam line understood? Do the Hall B people need anything more from us?
no discussion
- Comments: 
1) Installation and survey procedures for the Silicon Vertex Detector and ECal will be produced by those groups.
2) John will coordinate the "Calibration of Detectors" procedures working with the ECal and Silicon Detector groups. 
- Other?
  • No labels