1pm Eastern time
Room B101 in B-wing at JLab
Agenda
Minutes
Present at JLab: Krister, Nerses, Ani, Hovanes, Stepan
Present at SLAC: Pelle
Present in Glasgow: Bryan
Status of SVT voltages
- Hovanes implemented fake hybrid LV records on the SVT power IOC. Now all SVT voltage channels are represented.
- Hovanes is working on the power up and power down sequences for the hybrid power. These are programmed in an EPICS record database.
- Bryan made the GUI for hybrid LVs and implemented the button that would trigger group operations, such us power up, power down, set bias voltages etc.
- Ani added the hybrid voltage channels to the alarm screens and also added Bryan's GUIs an their analogues to the action buttons on the alarm screens.
DAQ IOC
- Pelle and Sho are learning how to run EPICS IOC
- The plan is to use EPICS sub-record to interface with the DAQ to control voltages and monitor temepatures
ECAL voltages
- Nerses will be working on transferring the ECAL/IC voltage software to the new EPICS.
- Using the old CLAS scheme Nerses will configure the IOC, create control and alarm screens
Action items
- Hovanes needs to implement "channel reset" capability for MPOD channels.
- Nerses will implement the CLAS CAEN voltage control in new EPICS
Pelle will study how to use sub-records in EPICS- Krister will install the cables for the beam stopper and beam viewer (from previous meeting).