Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
Slides from Takashi on checking Gaussian approximation with EGS simulation - link
Collimator scattering at JLab - link
NLCTA beam test slides from Pelle - link
10:10
Module fully installed but powered off. Out sensor is ~177cm from the exit window.
Mike setting up electron gun; some tuning is needed on the beam line since last experiment ran at 60MeV instead of 120MeV.
10:30
Beam E=119.3MeV, 50pC at gun, 10Hz
Start with 0 foils in order to search for the beam on the insertable phosphor screen.
The Phosphor screen is at ~75cm from exit window.
We use the measured voltage on the toroid located downstream of the spectrometer magnet: "ADC1".
At this point ADC1=0.06V which is ~40pC according to Mike.
10:37
Move in foils one by one and observe beam spot on phosphor screen. Picture and extracted spot size at each thickness can be seen below.
# foils |
FWHM |
---|---|
0 |
|
1 |
|
2 |
|
3 |
|
4 |
|
5 |
|
6 |
|
7 |
|
We should check if we can extract the beam spot size on the Be window from this data and ask Mike if it's consistent with his experience.
10:49
Lower bunch charge.
Insert 6 foils.
Still possible to see the beam on the phosphor screen but barely.
Mike estimates this to be order of 1fC/bunch.
10:55
Trying to time in readout using external trigger. Observe strange very large signals that went away after restart of daq. The disconnected APV got occassional hits at 0 ADC? This seemed to happen a few times even after we disabled it in the configuration. Is that possible even? We kept it disabled as it screwed up the scale.
We stepped through the latency setting from 130->5 with no sign of signal.
The linac had tripped so we don't know if we could have seen anything.
11:10
Linac back again.
10Hz, 120MeV, ~fC (estimation)
180V bias, see a ~10uA leakage current. This doesn't chance when beam goes on/off.
We observe large, ~400ADC, sample to sample shifts when using external trigger.
When beam is turned off we still see ~100ADC sample to sample shifts.
Everything looks ok with software trigger with beam on/off.
We turned off the RF equipment (X- and S) in the tunnel and that brought the noise back to 35-40ADC. Looks like there was some interference. This only happened on external trigger and due to time constraints we decided to go on with our program and forget about timing in.
11:30
Operation:
Foil thickness = 5:
I(pC)\Bias (V) |
180 |
250 |
350 |
400 |
450 |
500 |
---|---|---|---|---|---|---|
0.001 |
x |
x |
x |
x |
x |
x |
0.01 |
x |
|
x |
|
|
x |
0.1 |
x |
|
x |
|
|
x |
1.0 |
x |
|
x |
|
|
x |
10.0 |
x |
|
x |
|
|
x |
100 |
x |
|
x |
|
|
x |
highest possible |
x |
|
x |
|
|
x |
Time: 25x7min=175mins
IP address: 172.27.244.72
ttyS0: ibootbar
ttyUSB0: BK
ttyUSB1: keithley
1. old three-output
2. BK
3. keithley
4. PC
5. monitor
Serial: 115200 8N1
Common commands:
"get outlets" - list all outlets
"get outlet X" - list outlet X
"set outlet X on/off/cycle" - turn on/off/cycle outlet list outlet X
Manual
Serial: 9600 8N1
Common commands:
"measure?" - returns [voltage, current, ]
"source:voltage?" - returns voltage
"source:voltage 10" - set to 10 V
"output on" - output on
"output?" - returns 1 for on, 0 for off
"source:voltage:range up/down" - change range for voltage setting
Manual
Serial:
Common commands:
"SOUT000" - enable output
"SOUT001" - disable output
"VOLT00XY.Z" - sets voltage to XY.Z Volts
460V-5.2uA (minutes to get down that low and still decreasing)
500V-5.7uA-3.6uA (20mins)