Agenda
- Consolidation of the Beamline Schedule (Marco, Stepan)
- The current baseline considers the HPS experiment installed inside the alcove downstream the CLAS12 experiment in Hall-B. This decision was taken after consultation with the JLAB management, but after the submission of the proposal in May'13. An appendix (here ) and en implementation plan (here ) were developed to describe the feasibility as well as the impact on the schedule of both experiments.
-
-
- HPS Implementation Plane in ethe Alcove
- Addendum to the Proposal
- ECAL review preparation (Raphael, Stepan, Marco)
- FY13 Budget endgame (Marco)
- Around the table, AOB (All)