You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 18 Next »

Template to cut and paste into logbook

Start of shift

------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Hall B beamline shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:

 [Low Voltage]      [Lowest (mA)]     [Highest (mA)]
 AVDD
 DVDD
 V125



Check high voltage setting for each module:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):

                 [Hybrid/Module #]
Lowest [C]:
Highest [C]:


ECal status (short summary):

Trigger status (short summary):

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift:

SVT plans for the shift:

Notes from previous shifter:

 

Hourly checklist

------- HPS SVT Hourly Shift Checklist --------

Current run/status:

Time:

SVT module power status (ON/OFF):

[Low Voltage]      [Lowest (mA)]     [Highest (mA)]
 AVDD
 DVDD
 V125


Check high voltage setting for each module:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):

                 [Hybrid/Module #]
Lowest [C]:
Highest [C]:

ECal status (write a small summary):

Trigger status (write a small summary):

Pair spectrometer magnet:
         [Current]   [B-field]
Value:

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans:

Notes/comments:


Shift summary

------ HPS SVT Shift Summary Checklist -------

Shifter name:

Time and date:

Runs taken:

?[Run nr]  [Start]  [Stop]  [Events]  [Beam current]  [Beam position X] [Beam position Y]  [Comments]

Next Shifter:

Notes/comments:
 

Comments

  • No labels