Template to cut and paste into logbook

Start of shift

------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Hall B beamline shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:

What is the high voltage value for each module:

Check high voltage setting for each module:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):

ECal status:

Trigger status:

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift:

Notes from previous shifter:

 

Hourly checklist

------- HPS SVT Hourly Shift Checklist --------

Current run/status:

Time:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:

What is the high voltage value for each module:

Check high voltage:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):

ECal status:

Trigger status:

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans:

Notes/comments:


Shift summary

------ HPS SVT Shift Summary Checklist -------

Shifter name:

Time and date:

Runs taken:

?[Run nr]  [Start]  [Stop]  [Events]  [Beam current]  [Beam position X] [Beam position Y]  [Comments]

Next Shifter:

Notes/comments:
 