You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Template to cut and paste into logbook

Start of shift template

------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Hall B beamline shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD, V125 incl. module nr:

What is the high voltage value for each module:

Check high voltage currents (should be 0 in GUI):

Check SVT module temperature, write down highest and lowest temperature:

ECal status:

Trigger status:

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift:

Notes from previous shifter:

 

Hourly Shift checklist template

------- HPS SVT End of Shift Checklist --------

Current run/status:

Time:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD, V125 incl. module nr:

What is the high voltage value for each module:

Check high voltage currents (should be 0 in GUI):

Check SVT module temperature, write down highest and lowest temperature:

ECal status:

Trigger status:

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans:



End of shift template

------ HPS SVT End of Shift Checklist -------

Shifter name:

Time and date:

Runs taken:

?[Run nr]  [Start]  [Stop]  [Events]  [Beam current]  [Beam position X] [Beam position Y]  [Comments]

Next Shifter:

Comments

  • No labels