You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 4
Next »
Attendance:
Agenda/Notes:
- ePixM June 15th Beamtime Prep:
- Setup deployment on Wednesday, June 12, 9 am - 12 pm
- Confirmed by Matt Hayes
- Check detector running in DAQ
- Check the fibers connection
- Hardware Prep
- Fiber convertor and thined unit at ASC now
- New power cable ordered by Dawood
- Pinhole holder design
-
- Need to optimize and prevent light leakage. (Chris Koerber)
- Measurement plan
- Stuff to do:
- Look at crosstalk with softHI, look for Y, improve fitting
- mini-X tests in marrietta
- Status
- June15th beamtime: V2 vs V4 modules? What measurements do we want?
- softHI and auto: attenuator scan, but sit at one point for a long time (for more stats). Zoom in on low flux range.
- location dependence of effect
- take data that simulates a potential correction algorithm (black out part of the detector)
- softHI pinhole re-do: something odd with the data from day1.
- Basic script suite