You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 34 Next »

Motor Configuration

From Eric on LCLS coordinate systems:

  • X=N-S
    Z=E-W
    Y=vertical
    X+ = north
    Z+ = west
    Y+ = top
  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


StageIOCPVCablingParameter Manager ConfigStatus

Talbot Y: Micos PLS-85 #1

ioc-mec-usrppl-ims

MEC:USR:MMS:25

HDB 15 to PR60 patch panel

CA-261-805-23-C00


MEC/PLS-85 In-Air

Operational. Check directions. 

Talbot X: Newport UTS100PP

ioc-mec-ppl-xps3MEC:PPL:MMN:24

Direct in-air cabling.

Newport

Operational. Check directions. 

Talbot Z: Newport UTS100PP

ioc-mec-ppl-xps3

MEC:PPL:MMN:23

Direct in-air cabling.


Newport

Operational. Check directions. 

East Lens GHIJ: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[17-19]

Using XPS3 #1-#3 cables, Flange B *1 - *3.

Newport

Operational.

17: -SW +NE

18: -UP +DOWN

19: Check directions.  Eric's advice worked: Kill then Re-init/Home.

To do: 

  • secure vacuum side connections with cable ties

West Lens ABEF: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[20-22]

Using XPS3 #4-#6 cables, Flange B *4 - *6.

Newport

Operational.

20: -S +N

21: -UP +DOWN

22: -W +E

To do: 

  • secure vacuum side connections with cable ties

VISAR Lens: XYZ

ioc-mec-ppl-xps2

MEC:PPL:MMN:[09-11]

XPS2 #1-#3 cables come into bottom SW flange.Newport

Operational.

9: -N +S

10: -UP +DOWN

11: -E +W

JJ Slit: X

ioc-mec-tc1-vt21hv-ims

MEC:TC1:MMS:[17,18]

We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS".

Routing is R64B to North side of target chamber via overhead cable trays.

This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP).

A new drawing and CAPTAR tags need to created.


Running without limit switches. Need to diagnose and correct.

17: -N +S

18: -OPEN +CLOSE

JJ Slit: Y

ioc-mec-tc1-fwheels-ims

MEC:TC1:MMS:[01,02]


Running without limit switches. Need to diagnose and correct.

01: -DOWN + UP

02: -OPEN +CLOSE



Detector Configuration

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Zyla

daq-mec-cam02

daq-mec-cam01

-c 0 -i "MecTargetChamber/0/Zyla/0"USB - fiber optic extender - USB via overhead cable tray dropping into R60.

Operational.

Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see ECS-4009 - Getting issue details... STATUS .

Alviumdaq-mec-pgp01-s 036T9 -l 400000000

TBD 

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.

Pending.
Visar1daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.

DAQ/AMI-2 

IssueNotesStatus
XTCAVNeed to test.
AMI-2

Run AMI-2 with:

  • Quads (4)
  • VISARS (2)
  • Zyla (1)
  • Alvium (1)

Peregrine to create test framework, with guidance from Vincent.


  • No labels