Week of Jan 8th 2018
- DataPortal
- finish off ITL-3800C-368 ingest after sorting out http authentication errors
- revisit plots
- Hold off on MET updates until new traveler to reingest ITL sensors is available.
- NERSC Support
- Workflows/L2 DC2 pipeline
- Fermi
- Attend Wednesday software meeting
- Finish setting up GR L1 branch https://github.com/fermi-lat/GlastRelease
- Test L1 build in Jenkins https://fermi-lat.github.io/doc/workflow.html
- nEXO & SNiPER
- Attend Tuesday software meeting
Week of Dec 18th 2017
- DataPortal
- Workflows/L2 DC2 pipeline
- Reproduce error James P sees
- Repeat experiment with multiple visits
- Repeat experiment using Head of ImageProcessingPipeline repo
- Potentially meet with Jim & James this week
- Catch up on Parsl progress
- CI
- Set up new Docker image to use with imSIm's travis builds
- Create a smaller Docker images for use with travis
- NERSC Support
- Shared Stack
- JupyterHub documentation and simplification
- clean old project space by removing MBII-snapshots
- Request reduction in old project space quota to 40 TB
- imSim
- Fermi
- Set up GR L1 branch in GitHub
- Test build of L1 branch
- SNiPER
- Read up on SNiPER
- Meet with Lisa K on Tuesday 5 PM Eastern
- send feedback on documentation
- set up user accounts on Wiki, LLNL, OSG
- talk to Tony about nExo
Week of Dec 11th 2017
- Data Portal
- Deploy ETCCB-429
- MET updates - almost complete
- CCS ATS
- Install mvn and associated libraries and get Nick going with Lakeshore driver
- Install mvn and associated libraries and get Nick going with Lakeshore driver
- Workflows/L2 DC2 pipeline
- Send James P a link to the recordings from last week
- Repeat test using Jim's parsl wf at NERSC
- CI
- Docker image for use in travis builds
- Docker image for use in travis builds
- imSIM
- NERSC Support
- Fresh Shared Stack installation for KNL - stuck working out disk space in the common software area – started
- dmtcp installation
- Update jupiter-dev documentation
- quota checker
- Fresh Shared Stack installation for KNL - stuck working out disk space in the common software area – started
- Fermi
- Try GR with repoman
- Documentation
Week of Nov 27th 2017
- L2 pipeline DC1 rerun
- Finish off write up of chat with Tony
- Ask James P about remote participation during Spring Week
M & W 8 - 12 central time - Try a run using Simon's cookbook
- Meet with Jim & James P
- write up notes
- Try Parsl pipeline at NERSC
- NERSC software installations
- Shared Stack installation - verify that the DESCQA and py3 install is working
- Add CCL
- Install new sims 2.4.2 using DMstack w.2017.46 Haswell-gcc6 using py3
- Ask about cosmosis needs
- Install cosmosis, TreeCorr, and MLZ in projecta area under the WL WG directory
- Install phosim 3.7.3
- dmtcp
- quota checker
- Consider requesting more common software space
obtained 50 GB more
- Shared Stack installation - verify that the DESCQA and py3 install is working
- NERSC project space
- Verify MBII-snapshots is in HPSS and remove from project area
Found the content in the desc hsi area, and viewed the contents of some snap.tar via htar -tf CS/MBII-DMO-snapshots/snapdir_074.tar Also noticed that the group_xxx.tar files are duplicated in the Archive home directory. Contacted Mustafa to sort that out and remove duplicates.
- Verify MBII-snapshots is in HPSS and remove from project area
- Data Portal
- MET updates
- Meet with Anders and Seth
- MET updates
- Harvard ATS
- Check that ccs reboot restarts the MySQL, LocalRestServices, and Trending
- Check in with Nick about the Lakeshore
- Fermi
- Try GR using repoman
- Documentation
- Discuss Gaudi for nEXO
https://gaudi.web.cern.ch/gaudi/releases/v30r0/
http://lcgsoft.web.cern.ch/lcgsoft/release/
https://gitlab.cern.ch/gaudi/Gaudi - Attend Stanford IT Unconference
https://itunconference.stanford.edu/sessions/remote
Week of Nov 20th 2017
- L2 pipeline DC1 rerun
- NERSC software installations
- py3 shared stack installation
- finish phosim 3.7.2 installation
- dmtcp intel installation
- quota checker
- cosmosis installation
- check in on GH issue https://github.com/LSSTDESC/WLPipe/issues/31
- Cover Vendor Ingests M-W
- Data Portal
- plots
- check in with Tony about his changes to load the page more quickly
- Harvard ATS
- Determine who will deal with the Lakeshore drivers
https://jira.slac.stanford.edu/projects/LSSTCCSDRIVER/issues/LSSTCCSDRIVER-227
https://github.com/lsst-camera-ccs/org-lsst-ccs-drivers-lakeshore/tree/LSSTCCSDRIVER-227
https://www.lakeshore.com/Documents/336_Manual.pdf - Grab Owens updates and install on CCS machine
- Direct Nick to make updates as needed.
- Fix mounting of data drive on ccs machine
- Try a version of the TS subsystem on the ccs machine and set up groovy & properties files
- Check monochromator plays well with the TS subsystem
- Determine who will deal with the Lakeshore drivers
- Fermi
- Try a GR build with repoman
- Documentation
- Inquire about pointlike updates in CVS on Slack
Week of Nov 13th 2017
- Harvard ATS
- Create user accounts and ccs sudo account which grants sudo access to all users
- Set up directory structure following IR2 model
- Install DMstack v14
- Install eotest compatible with v14
- document the above on the Confluence page ATS Test Stands
- Set up Trending Database
- MariaDB installation
- L2 pipeline DC1 rerun https://github.com/LSSTDESC/SSim_DC1/issues/47
- Meet with Jim on Monday
- Write up Notes
- Contact James P
- Try to run Simon's Cookbook
- Chat with Tony
- Meet with Jim on Monday
- NERSC Software Installations
- Shared Stack
- first try failed due to conflicts with libiconv installed presumably for
- Phosim 3.7.2 bug fix for haswell gcc & intel, KNL gcc & intel
- DMTCP intel build
- Help out with cosmosis installation https://github.com/LSSTDESC/WLPipe/issues/31
- Shared Stack
- Data Portal
- Chat with Tony about plots
- Plots
- Bad Channels
- read noise
- NERSC Project Space
- Test MBII-snapshot HPSS copy and remove from project area
Week of Nov 6th 2017
- QA Testing
- Investigate cause of differences between Lauren's plots from NCSA and those generated at NERSC
- look at 'conda list' on both NCSA and NERSC (no differences discovered)
- generate cal_refs as was done at NCSA
- try gcc 6 build as is being done at NCSA
- Determine the cause of differences between ref catalogs at NCSA and NERSC
- Investigate cause of differences between Lauren's plots from NCSA and those generated at NERSC
- L2 Pipeline
- Data Portal
- Finish off first round of Richard's plots
- bad channels
- read_noise
- Finish off first round of Richard's plots
- NERSC Project Space
- test MBII-snapshot HPSS copy
- ATS
- prep for Tony & Owen's visit
- Installations
- SLAC
- Py3 on SLAC RH6-64 for Joanne to test out
- NERSC
- finish testing NERSC's cfitsio installation
- install phosim 3.7.1 for Cori haswell gcc & intel, KNL gcc & intel
- ask Glenn to install module files
- install phosim 3.7.2 for Cori haswell gcc & intel, KNL gcc & intel
- Shared Stack Installation using w.2017.41
- Query DESCQA and CCL groups
- py2 w.2017.41 installation
- py3 w.2017.41 installation
- SLAC
Week of Oct 30th 2017
- Data Portal
- Plots
- DC2 prep
- QA testing
- w.2017.41 installation plus branches of obs_lsstSim and pipe_analysis
- Run visitAnalysis, coaddAnalysis, etc
- QA testing
- NERSC Workflow work
- NERSC Project Space
- Work with Mustafa to get MBII-snapshot backed up
- NERSC Installations
- w.2017.? stack installation plus sims - waiting on new sims release using the camera geometry updates
- Phosim 3.7
- Testing NERSC cfitsio installation
- SLAC Installations
- descsoft w.2017.? stack plus sims installation
- CCS
- See if there is any prep work necessary for Tony's visit later in Nov
- Request Nick set up new box with CentOS7
- set up user accounts and groups
- Determine if Mike is still coming out ~Nov 1st
- See if there is any prep work necessary for Tony's visit later in Nov
- Attend SuperCDMS meeting concerning their potential move to NERSC.
Week of Oct 23rd 2017
- Data Portal
- NERSC Workflow work
- Try out HTCondor and Pegasus on cori21
- Take a look at Jim's imsim script
- NERSC Project Space
- Set the old project directory to read-only (in progress)
- claim desc ownership of the whole directory space
- Clear out all directories where the owners have indicated it is fine to do so
- Determine the end state of merging old project and projecta areas and handling of www
- Set up disk quota monitor
- Coordinate HPSS storage of MBII-snapshots
- Set the old project directory to read-only (in progress)
- NERSC installations
- Phosim v3.7
- Coordinate with NERSC to get cfitsio v3410 installed (in progress)
- Rebuild using NERSC supplied cfitsio
- Coordinate with Glenn to set up module files
- Set up software for DC2 testing
- v14_0 lsst_distrib + sims 2.4.0
- Phosim v3.7
- SLAC installations
- Set up same imsim at SLAC as used at NERSC for KNL testing (in progress)
- v14_0 on RH6-64 public (on hold pending resolution to obs_base testCameraMapper.py unit test failure)
- camera area
- descsoft
- test eotest branch
- v14_0 on IR-2
- Document KNL vs Haskell mkl imsim testing at NERSC
- Initial mkl tests indicate no huge improvement - putting testing on back burner for now
- CCS - still waiting to hear from Peter, I cannot access their TS3 machine to install and test a new version of the test stand subsystem
Week of Oct 16th 2017
- Richard's plots in DP
- Complete Sensor Arrival Time plot
- Create JSON
- NERSC installations
- Phosim v3.7
- Try out NERSC supplied FFTW
- Request new cfitsio v3410 installation required by Phosim
- Complete installation of all flavors: haswell-gcc, haswell-intel, knl-gcc, knl-intel
- Waiting on cfitsio v3410 before knl-intel will be available
- Phosim v3.7
- NERSC Project Space
- Notify all users of the need to migrate
- Handle all help requests - migrating some directories to the new projecta area
- Install disk quota monitor
- Check on old project status and prepare to set it to read-only
- Coordinate backup of nkhandai data to tape with Mustafa
- Install latest version of teststand subsystem at Harvard there is a machine made available - waiting on response from Peter
- Keep an eye out for v14 DMstack
Week of October 9th 2017
- Continue work on Richard's plots in DP
-
-
LSSTTD-1165Getting issue details...
STATUS
- Released Data Portal 0.5.7
- Testing imSim built on KNL
- Continue MKL tests at NERSC once the system recovers from the weekend outage
- Install the same version of the stack at SLAC to allow similar testing with and without MKL
- Attempt build of DMstack using the intel compiler at NERSC
- NERSC Project space
- Install disk quota monitor
- Coordinate backup of nkhandai data to tape with Mustafa
- Prepare to set the old project area as read-only
- Send mail to all owners of files on the old project space
- NERSC HPSS SRU overallocation
- Install latest version of datacat-utilities 0.0.8 at SLAC
- Install the latest teststand snapshot at Harvard to support use of the monochromator when Peter returns.
- Contacted Peter - I can't connect to the archon machine to install the test stand snapshot
- Investigate creating a harvard.groovy (perhaps based on TS8bench or TS7) and possibly create a harvard main routine.
- Keep an eye out for the v14 DMstack release and prepare to install on IR-2 and NERSC
- This release will include binary installations.. I'm thinking we may still want to install from source, perhaps that's most useful on IR-2, but we'll see.
- This release will include binary installations.. I'm thinking we may still want to install from source, perhaps that's most useful on IR-2, but we'll see.
Week of October 2nd 2017
- Release DataPortal 0.5.6 which will include
- Implement Richard's plots in the DP starting from some of Tony's examples for trending and Richard's python code.
- Continue testing KNL performance using galsim and imsim
- Attempt to compile galsim and possibly all of DMstack with the intel compiler
- Run longer tests using the MKL libraries on Haswell and KNL
- Rebuild imsim with MKL, using an updated meas_base
- Install an initial shared stack in the new software area at NERSC for testing as discussed at last week's "Shared Stack" meeting
- NERSC Project Space
- Set up an initial quota monitor at NERSC
- Re-connect with Mustafa to get the mkhandai 42 TB archived to tape.
- Investigate an upgrade of the monochromator driver at Harvard and confirm that to achieve what Peter plans to do - to run his ATS work in the lab alongside most of the devices from his TS3 setup.. is possible by running both the teststand and rafts subsystem simultaneously.
- Install latest SNAPSHOT of test stand at Harvard and investigate creating a harvard.groovy (perhaps based on TS8bench or TS7) and possibly creating a harvard main routine.
- Keep an eye out for the v14 release of the DMstack and prepare to install at SLAC/IR-2 and NERSC.
Though this is assigned to Jim, so perhaps I have no need to worry about SLAC:
- LSSTTD-1157Getting issue details... STATUS