Week of Nov 6th 2017
- QA Testing
- Investigate cause of differences between Lauren's plots from NCSA and those generated at NERSC
- look at 'conda list' on both NCSA and NERSC (no differences discovered)
- generate cal_refs as was done at NCSA
- try gcc 6
- Investigate cause of differences between Lauren's plots from NCSA and those generated at NERSC
- Data Portal
- Finish off a first round of Richard's plots
- Installations
- SLAC
- Py3 on SLAC RH6-64 for Joanne to test out
- NERSC
- finish testing NERSC's cfitsio installation
- install phosim 3.7.1 for Cori haswell gcc & intel, KNL gcc & intel
- SLAC
Week of Oct 30th 2017
- Data Portal
- Plots
- DC2 prep
- QA testing
- w.2017.41 installation plus branches of obs_lsstSim and pipe_analysis
- Run visitAnalysis, coaddAnalysis, etc
- QA testing
- NERSC Workflow work
- NERSC Project Space
- Work with Mustafa to get MBII-snapshot backed up
- NERSC Installations
- w.2017.? stack installation plus sims - waiting on new sims release using the camera geometry updates
- Phosim 3.7
- Testing NERSC cfitsio installation
- SLAC Installations
- descsoft w.2017.? stack plus sims installation
- CCS
- See if there is any prep work necessary for Tony's visit later in Nov
- Request Nick set up new box with CentOS7
- set up user accounts and groups
- Determine if Mike is still coming out ~Nov 1st
- See if there is any prep work necessary for Tony's visit later in Nov
- Attend SuperCDMS meeting concerning their potential move to NERSC.
Week of Oct 23rd 2017
- Data Portal
- NERSC Workflow work
- Try out HTCondor and Pegasus on cori21
- Take a look at Jim's imsim script
- NERSC Project Space
- Set the old project directory to read-only (in progress)
- claim desc ownership of the whole directory space
- Clear out all directories where the owners have indicated it is fine to do so
- Determine the end state of merging old project and projecta areas and handling of www
- Set up disk quota monitor
- Coordinate HPSS storage of MBII-snapshots
- Set the old project directory to read-only (in progress)
- NERSC installations
- Phosim v3.7
- Coordinate with NERSC to get cfitsio v3410 installed (in progress)
- Rebuild using NERSC supplied cfitsio
- Coordinate with Glenn to set up module files
- Set up software for DC2 testing
- v14_0 lsst_distrib + sims 2.4.0
- Phosim v3.7
- SLAC installations
- Set up same imsim at SLAC as used at NERSC for KNL testing (in progress)
- v14_0 on RH6-64 public (on hold pending resolution to obs_base testCameraMapper.py unit test failure)
- camera area
- descsoft
- test eotest branch
- v14_0 on IR-2
- Document KNL vs Haskell mkl imsim testing at NERSC
- Initial mkl tests indicate no huge improvement - putting testing on back burner for now
- CCS - still waiting to hear from Peter, I cannot access their TS3 machine to install and test a new version of the test stand subsystem
Week of Oct 16th 2017
- Richard's plots in DP
- Complete Sensor Arrival Time plot
- Create JSON
- NERSC installations
- Phosim v3.7
- Try out NERSC supplied FFTW
- Request new cfitsio v3410 installation required by Phosim
- Complete installation of all flavors: haswell-gcc, haswell-intel, knl-gcc, knl-intel
- Waiting on cfitsio v3410 before knl-intel will be available
- Phosim v3.7
- NERSC Project Space
- Notify all users of the need to migrate
- Handle all help requests - migrating some directories to the new projecta area
- Install disk quota monitor
- Check on old project status and prepare to set it to read-only
- Coordinate backup of nkhandai data to tape with Mustafa
- Install latest version of teststand subsystem at Harvard there is a machine made available - waiting on response from Peter
- Keep an eye out for v14 DMstack
Week of October 9th 2017
- Continue work on Richard's plots in DP
-
-
LSSTTD-1165Getting issue details...
STATUS
- Released Data Portal 0.5.7
- Testing imSim built on KNL
- Continue MKL tests at NERSC once the system recovers from the weekend outage
- Install the same version of the stack at SLAC to allow similar testing with and without MKL
- Attempt build of DMstack using the intel compiler at NERSC
- NERSC Project space
- Install disk quota monitor
- Coordinate backup of nkhandai data to tape with Mustafa
- Prepare to set the old project area as read-only
- Send mail to all owners of files on the old project space
- NERSC HPSS SRU overallocation
- Install latest version of datacat-utilities 0.0.8 at SLAC
- Install the latest teststand snapshot at Harvard to support use of the monochromator when Peter returns.
- Contacted Peter - I can't connect to the archon machine to install the test stand snapshot
- Investigate creating a harvard.groovy (perhaps based on TS8bench or TS7) and possibly create a harvard main routine.
- Keep an eye out for the v14 DMstack release and prepare to install on IR-2 and NERSC
- This release will include binary installations.. I'm thinking we may still want to install from source, perhaps that's most useful on IR-2, but we'll see.
- This release will include binary installations.. I'm thinking we may still want to install from source, perhaps that's most useful on IR-2, but we'll see.
Week of October 2nd 2017
- Release DataPortal 0.5.6 which will include
- Implement Richard's plots in the DP starting from some of Tony's examples for trending and Richard's python code.
- Continue testing KNL performance using galsim and imsim
- Attempt to compile galsim and possibly all of DMstack with the intel compiler
- Run longer tests using the MKL libraries on Haswell and KNL
- Rebuild imsim with MKL, using an updated meas_base
- Install an initial shared stack in the new software area at NERSC for testing as discussed at last week's "Shared Stack" meeting
- NERSC Project Space
- Set up an initial quota monitor at NERSC
- Re-connect with Mustafa to get the mkhandai 42 TB archived to tape.
- Investigate an upgrade of the monochromator driver at Harvard and confirm that to achieve what Peter plans to do - to run his ATS work in the lab alongside most of the devices from his TS3 setup.. is possible by running both the teststand and rafts subsystem simultaneously.
- Install latest SNAPSHOT of test stand at Harvard and investigate creating a harvard.groovy (perhaps based on TS8bench or TS7) and possibly creating a harvard main routine.
- Keep an eye out for the v14 release of the DMstack and prepare to install at SLAC/IR-2 and NERSC.
Though this is assigned to Jim, so perhaps I have no need to worry about SLAC:
- LSSTTD-1157Getting issue details... STATUS