You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 28 Next »

SVT EPICS Power Instructions

DAQ & Power Mapping in Group C

Operation

!!! Remember to make sure the detector is being cooled. !!!

!!! Remember to make sure the interlocks are in the state you want them. !!!

Logbook

1/14/2013

System status (from Ben's email Jan 7th):
We can currently power 8 FEBS. We can power every hybrid attached to those 8 FEBS: 30 Hybrids. All Hybrids that we can power are able to sync, except for FEB 8, Hybrid 2, which has just 1 APV that won’t sync.
Link to excel file. 

L1t (DAQ FEB #0 and GUI FEB #0) has what looks like a short on the output side of the regulator on DVDD (we can’t see the short probing the pins from outside).
L6b (DAQ FEB #5 and GUI FEB #7) first appeared to have a short on DVDD. After 5mins and a power cycle it came back with current levels that looked reasonable except that the DVDD level indicated it had no control link. 

11:00AM
Removing FEB cooling plate from SVT box to rework FEBs.

 

Equipment

Interlock board

see Group C interlock board for instructions on monitoring and controls.

Serial portserver

Digi Portserver TS 4: 192.168.1.217 on LAN. Telnet from ppa-pc91245, e.g. "telnet 192.168.1.217 2001" will connect you to port 2001. All serial ports are logged to /var/log/portserver on ppa-pc91245. Configure the portserver using its web interface or Telnet. Docs: http://www.digi.com/support/productdetail?pid=1954

PortTelnet portHardwareUseful for
12001BK 1697 power supply, powering interlock boardresetting interlock board: SOUT000 to turn on, SOUT001 to turn off
22002iBootbar remote control power stripresetting TE chiller: login as admin:admin, "set output 1 off" "set output 1 on"
32003  
42004  

Thermoelectric chiller (backup chiller for FEB)

Oasis 190: manual

Error bits:

biterror
0Tank Level Low
1Tach Fail
2Thermistor Temp > Alarm
3PCW Low
4Thermistor Fault
5Pump Fault
6(not used)
7Thermistor Temp < Alarm

Procedures

Basic instructions to take a pedestal run with CODA

To be added.

 

 

Miscellaneous

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./pgpcard_load






 

OLD:Take a calibration run with expert SVT GUI

 

Start the DAQ:

 

$ cd /u1/software/software_new

 

$ source setup_env.csh

 

$ ./bin/frontEndTestGui

 

Click <read status> and make sure no error is seen. If so, check that the FEB is powered correctly.

 

Make sure the AxiXadc temperature is ok (50-60C).

 

Configure with config/FrontEndBoardConfigC01.xml

 

Click <read status> and check that more registers are found.

 

Turn on power to hybrids (see below)

 

Do a hard reset under commands/FebCore/HybridHardReset (current on AVDDP should drop ~100mA).

 

Click <Write config>.

 

Do a soft reset under commands/FebCore/HybridSoftReset.

 

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

 

Test Run SVT Group C Setup

 

Group C SVT test setup

 


 

  • No labels