This page collects information about the SLAC involvement in the read-out of the Cathode Strip Chambers, which is one of ATLAS's four muon systems and designed to provide precision measurements in the forward region.

Documentation

Collection of original CSC ROD Documents

CSC Pulser document (pdf)

NRC (New ROD Complex) Twiki page

Commissioning

CSC Readout Commissioning Week June 2014 (C1)

TDAQ Testbed in Building 4

Workshops and Reviews

CSC Readout Replacement Conceptual Design Review (Oct/2012)

NRC design working meeting (CERN, Jan/2013)

Record of some operation issues in April/2011

Date

Time

Run

E-log

Description

26/4/11

00:30

188242

144015

CSC link lock failed for CSC EC sectors 2,12 in run 188242

23/4/11

12:08

 

143395

Replaced SPU B0 in ROD slot A06: fixes data integrity for Sector A02 Layer 1

 

21/4/11

21:03

180124

142983

CSC related DAQ (monitoring) issues (CSC ADC time spikes and fit fail flag not propagating upwards ?)

20/4/11

18:41

 

142743

high rate test of CSC DPU code modification

18/4/11

12:41

 

142255

Change in OKS database (CSC main controlled moved from private machine to online machine)

13/4/11

19:08

 

141017

CSC high rate test (busy 4.5% @ 75Khz after initial confusion of a hot channel)

5/4/11

17:18

178992

139735,
 139748

CSC errors during run 178992

1/4/11

7:59

 

139093,
139165

OHP (large fraction of bad data - due to A01-02 losing HV)

ROD Software and firmware releases