You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Runs Digest

The following is a digest of the T9 runs. Get the full list or the selected run from the pipeline or elogbook. (WORK IN PROGRESS)

 Electron runs

 Runs

 Date

particle

energy

CU configuration

CU position

AD

notes

 1201

 11/8

e- 

 2.5

 BT1

 

 

 av rate 34 HZ, CU instant rate 500 hz. S0 counts 21k per spîll

 1202

 

 e-

 2.5

 BT1

 

 

 3 phasing errors for 30k events. run stopped due to beam off

 1203

 

 e-

0.5 

 

 

 

 S0 = 13k/spill, wrong focus setting

 

 

 

 

 

 

 

 

 

Tagged photon runs

 Runs

particle

energy

CU configuration

CU position

AD

notes

1176 

tagged g

3GeV

BT1

0 degrees, center of tower 2

yes 

events in twr3?

 1177-1180

tagged g

e beam at 2.5GeV

BT1

0 degrees, center of tower 2

yes

magnet ON, 25K evts per run 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Full-brem Photon runs

 Runs

 Date

particle

energy

 I(Magnet)

CU configuration

CU position

AD

notes

1183-1190

 8/8
9/8 

e+g

2.5

 600

BT1

0 degrees, center of tower 2

yes 

overall 2M evts  - (false report of 300 A for 1185 in elogBook)


 



 





 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tagger calibration runs

 Runs

Date 

particle

energy (GeV)

CU configuration

CU position

AD

notes

 1148-1164; 1166-1169

 8/8

e beam

various

BT1

0 degrees, various positions to align with tagger

yes

many different configurations, for expert only

 1170

 

e beam

1.5

BT1

0 degrees, center of tower 2

 yes

 dump in place, slits at 51.5

 1171

 

e beam

1.25 

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration

 1172

 

e beam

1.125

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration-NOT Synchronised

 1173

 

e beam

 1.375

BT1

0 degrees, center of tower 2

 yes

magnet current 600A, direct tagger calibration, slits reduce to 51

 1174

 

e beam

1.125 

 BT1

0 degrees, center of tower 2

yes

magnet current 600A, direct tagger calibration

 

 

 

 

 

 

 

 

 CAL calibration runs

 Runs

particle

energy

CU configuration

CU position

AD

notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAL pedestal runs

 Runs

Date 

particle

energy

CU configuration

CU position

AD

notes

 1191

 9/8 8h51

-

-

 BT22 (S3 only)

-

-

monitor pedestal shift

 1165

 8/8

 

 

 BT22(S3 only)

 

 

 pedestal

 1198

 10/8

 

 

 BT22

 

 

 pedestal T ~22.3C

 1201

 11/8

 

 

 BT22

 

 

 Pedestal T~ ?

ACD Calibration runs

Runs

Date 

particle

energy

CU configuration

CU position

AD

notes

 1192, 1193

 9/8

 cosmic

 

 

 

 

 

 1194-1197

10/8 

 cosmic

 

 BT3

 

 

 

 

Not to be used 

Runs

Date 

particle

energy

 IMagnet

CU configuration

CU position

AD

notes

 1200

 

 e-

 2.5

 0

 

 

 

 ? Control Room ajustingSpill structure during run

 

  • No labels