New Items

Open Items from Previous Meetings

  • Need to add REF*239104 cavern ceiling to *40442 model
  • access tunnel is missing floor outside of TAO
  • chase occurrence properties in equipment platform
  • add a wall along east end of RRL hall where vents are
  • Work with LLNL on west wall beam transport to incorporate our models, not send their versions back to us.
  • Remove DSG*61000 from *40442
  • Have DSG*40024 not report up to *40442
  • Need to ask LLNL about portable HEPA:
  • Auxilliary equipment layout needs to be cleaned up. Generic Boxes need to be vetted (long term task)
  • Deal with occurrence properties:
  • No labels