New Items
- Need to add REF*239104 cavern ceiling to *40442 model
- access tunnel is missing floor outside of TAO
- chase occurrence properties in equipment platform
- add a wall along east end of RRL hall where vents are
- Work with LLNL on west wall beam transport to incorporate our models, not send their versions back to us.
- Remove DSG*61000 from *40442
- Have DSG*40024 not report up to *40442
Open Items from Previous Meetings
- There are two CF models in the top level model, Need to remove 4/25 model, keep 6-7-23
- Vacuum Lines need to be cleaned up
- Beam transport chamber is 1m into shield wall
- Need to to update access structure model to new concept (even if it's a rough draft)
- Remove LLNL racks and replace with SLAC racks on equipment platform
- Cut top off South Equipment platform/vestibule wall
- Cut top off South Equipment platform/vestibule wall
- Add new South Equipment platform/vestibule wall 1' offset from north elevator face (wall for personnel exclusion, EMP shielding, not structural)
- Need to ask LLNL about portable HEPA:
- Figure out cable tray layout with new equipment platform rack layout:
- Auxilliary equipment layout needs to be cleaned up. Generic Boxes need to be vetted (long term task)
- Remove old air handler model in access tunnel:
- Deal with occurrence properties:
- Why are we working on these delay boxes? They are not needed for FES scope and this layout doesn't work for DMPL.
- Need to get rid of old yellow box AMICA stay clear models. Using DSG*39856 as baseline FES HELP model.