New Items

  • Need to add REF*239104 cavern ceiling to *40442 model
  • access tunnel is missing floor outside of TAO
  • chase occurrence properties in equipment platform
  • add a wall along east end of RRL hall where vents are
  • Work with LLNL on west wall beam transport to incorporate our models, not send their versions back to us.
  • Remove DSG*61000 from *40442
  • Have DSG*40024 not report up to *40442

Open Items from Previous Meetings

  • There are two CF models in the top level model, Need to remove 4/25 model, keep 6-7-23
  •  Vacuum Lines need to be cleaned up
  • Beam transport chamber is 1m into shield wall 
  • Need to to update access structure model to new concept (even if it's a rough draft)
  • Remove LLNL racks and replace with SLAC racks on equipment platform
  • Cut top off South Equipment platform/vestibule wall
  • Cut top off South Equipment platform/vestibule wall
  • Add new South Equipment platform/vestibule wall 1' offset from north elevator face (wall for personnel exclusion, EMP shielding, not structural)
  • Need to ask LLNL about portable HEPA:
  • Figure out cable tray layout with new equipment platform rack layout:
  • Auxilliary equipment layout needs to be cleaned up. Generic Boxes need to be vetted (long term task)
  • Remove old air handler model in access tunnel:
  • Deal with occurrence properties:
  • Why are we working on these delay boxes? They are not needed for FES scope and this layout doesn't work for DMPL.
  • Need to get rid of old yellow box AMICA stay clear models. Using DSG*39856 as baseline FES HELP model.
  • No labels