Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

Introduction

The ATLAS 3D R&D group will be the first ATLAS user of the EUDET telescope. Compared to the BAT the framework is completely different and based on ILC type software built in a very modular fashion.

This page describes the basic steps used to install the EUDET software framework: EUDAQ.

Installation

Note that this installation was made to a IBM X41 laptop running Linux (Ubuntu 8.04 "Hardy"). The EUDAQ are expected to run on MacOSX, Windows and Linux.

Check out

Go to desired directory and make sure that Subversion (SVN) is installed.

First put the USE_LCIO parameter to 0 in

Code Block
$ svn co http://svn.hepforge.org/eudaq/trunk euda
Compile
Code Block
$ emacs /eudaq/main/Makefile
USE LCIO=0
$ cd /eudaq/
$ make

This compiles the main functions and the command line programs. In order to have access to the GUI's you need to compile

Code Block
$ make gui

TO get access to online monitoring

Code Block
$ make root

Note that ROOT must be installed.

The TLU can be installed and controlled (although should never really be needed) and it needs som USB libraries to run. In this case I installed:

Code Block
$ sudo aptitude install libusb++-dev libusb-dev

$ make tlu
Test

The installed programs can now be tested. Start the run control:

Code Block
$ cd /eudaq/bin

$ ./euRun

(This requires that LD_LIBRARY_PATH included /eudaq/bin.)

A GUI should appear. If the environment variable HOSTNAME is not set correctly it will show localhost.

A test producer can be started to check the communication by typing

Code Block
$ ./TestProducer

If there is no arguments it assumes localhost.

If the communication works this test producer should now appear in the run control. Messages can be set using

Code Block
$o "Hello"

Which should show up on the status line in the run control GUI.

  • 10-17 Oct. in H6 with the EUDET telescope
  • 24-04 Nov. in H8 (depending on if we can switch with ALFA) with the BAT and Morpurgo magnet
  • 20-25 Nov. in H6 with the BAT (preliminary)

CERN Test Beam Area

Test Beam Analysis Information: