Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

With the 2010 Soccer World Cup fast approaching the Seacom undersea fibre optic cable, plugging East Africa (Network Schematic) into high speed Internet , went live on Thursday July 23, 2009 - as reported by the BBC and CNN. Such a cable should dramatically reduce the cost of bandwidth measured in $/Mbps,  reduce the Round Trip Times (RTT) from >~ 480 ms for a geostationary satellite, down to 200-350ms (seen from N. America) by using shorter distance terrestrial routes. Also by increasing the capacity reduce the congestion and thus the losses and jitter.

...

<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="a18a7bb7fee57174-1917a3cf-4e344457-a8b5a94a-2538a529ee457b8acc4942a6"><ac:plain-text-body><![CDATA[

Throughput from SLAC to Regions of the World

Derived Throughput from SLAC to Africa Jan-Aug '09 [[xlsx

^africa-thru-aug09.xlsx]]

MinRTT from SLAC - Aug. 2009 [[xls

^map-africa-minrtt-aug2009.xls]]

]]></ac:plain-text-body></ac:structured-macro>

...

<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="5cd940d5e580cb5b-efdfe99e-4f1f4d69-87349af5-0f49bb43b83c156199f9add9"><ac:plain-text-body><![CDATA[

Routing from South Africa to African Countries (Sep '05)

Routing from South Africa to African Countries (Aug '09) [[xls

^routing-africa-aug2009.xls]]

Routing from Burkina Faso to African Countries (Aug '09) [[xls

^routing-africa-aug2009.xls]]

]]></ac:plain-text-body></ac:structured-macro>



...