...
The period will last about 3 months, starting at the end of March, with the beginning of Swift observations. The campaign ended on 5 July 2009.
Present coverage
...
and status of the data analysis.
Domain | Energy band/Filter/Frequency | Facility | Analyzer(s) | Status |
---|---|---|---|---|
Gamma-rays | 0.1-10 GeV | Fermi/LAT | Luigi F. | OK |
Hard X-rays | 20-100 keV | Swift/BAT | Luigi F. | OK, waiting for archival data of the latest 2 snapshots |
X-rays | 0.2-10 keV | Swift/XRT | Luigi F. | OK, waiting for archival data of the latest 2 snapshots |
Optical/UV | V,B,U,UVW1,UVM2,UVW2 | Swift/UVOT | P. Roming, M. Stark, Luigi F. | OK, waiting for archival data of the latest 2 snapshots |
Optical | B,V,R,I | ATOM | S. Wagner, M. Hauser | Waiting... |
NIR | J,H,Ks | INAOEP | L. Carrasco, E. Recillas, A. Carraminana | Received, OK |
NIR | J, K | WIRO | J. Norris | Received, OK |
Radio | 15 GHz | OVRO | T. Readhead et al. | Waiting... |
Radio | cm/mm, Polarization | Effelsberg | L. Fuhrmann & E. Angelakis | Waiting... Seen some preview |
Radio | 1-22 GHz | RATAN-600 | Kovalev et al. | Waiting... |
Radio | 15 GHz, Polarization | MOJAVE | Lister et al. | Waiting... |
Radio | 22 GHz | e-VLBI | Giroletti et al. | Waiting... Seen some preview |
Radio | 37 GHz | Metsahovi | Lahteenmaki et al. | Waiting... |
...
Swift schedule:
- 1st: 26 March 2009
- 2nd: 15 April 2009
- 3rd: 5 May 2009
- 4th: 10 May 2009
- 5th:15 May 2009
- 6th: 25 May 2009
- 7th: 4 June 2009
- 8th:14 June 2009
- 9th: 23 June 2009
...