Changed interlock to work with dewpoint instead of RH need to validate that this is okay.



Testing Procedure

  1. Checking the condition of the shipping and fill 
  2. Visual inspection [take off the plastic cover for the module to have a clear photo]
    1. 1 overview photo and photos for each chip
  3. Start dcs interlock Pi
    1. ssh pi@dcs-...
    2. cd ~/imagin
    3. python runAllInterlocks.py
  4. Start 19v power to Pi
    1. Check that dummy light turns on. 
  5. Start grafana
    1. http://atlascr.slac.stanford.edu:3000/d/31eiHlhSz/module_reception?orgId=1&from=now-5m&to=now
  6. Turn Air
  7.  Load Load module and connect power and data lines
  8. Turn on vaccuum
  9. Close box and check that dew point is lowering. 

Reception Test:

  1. Checking the condition of the shipping and fill 
  2. Visual inspection [take off the plastic cover for the module to have a clear photo]1 overview photo and photos for each chip