...
- MECU-FR-0015.doc: gives overview conops, but nothing controls related
- Details: facility layout, standard configurations (which laseres), port locations, laser maintenance, experimental operations (mock schedules), personnel requirements
- Subsystems:
- Rough Sequence:
- Details: facility layout, standard configurations (which laseres), port locations, laser maintenance, experimental operations (mock schedules), personnel requirements
Rochester (HELP)
- 2w Cal Shot Cycle and ConOps: Give a good idea of what we expect HELP to do
- Subsystems:
- Rough Sequence:
LLNL (RRSP/LP)
- Barry passed along a large, possibly too detailed flowchart via email (To be parsed / summarized...)
View file name MECU-LLNL-143 20231211 Experiment Model - Shot Sequence.pdf height 250 - Subsystems:
- Rough Sequence: