Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The period will last 3 months, starting at the end of March, with the beginning of Swift observations.

Present coverage:


  • Gamma-rays: Fermi/LAT
  • X-rays: Swift/XRT
  • Optical/UV:
    • Swift/UVOT (VBU/UVW1-UVM2-UVW2)
    • ATOM (BVRI, Wagner)
  • Radio:
    • OVRO 15 GHz (daily monitoring)
    • Effelsberg (cm/mm)
    • RATAN-600 (1-22 GHz, Kovalev)

Swift schedule:

...