Table 1.11 |
|
|
---|
Area | Position Prefix Codes | Physical Position |
---|
LR20 | L | Laser Room (Upstairs, near sector 20) |
---|
|
|
|
IN20 | B | Beam Line |
---|
| K | Klystron Gallery |
| W | Waveguide |
| R | RF Equipment Hut |
| L | Laser Line |
| M | Manifold |
|
|
|
LI20 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI21 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI22 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI23 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI24 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI25 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI26 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI27 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI28 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI29 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
LI30 | B | Beam Line |
---|
| W | Waveguide |
| K | Klystron Gallery |
| M | Manifold |
| E | Instrumentation Equipment Alcove |
|
|
|
BSY0 | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 136, 106, 106, 5) |
| P | BSY Pump Station (P0, P1, P2, P3, P5) |
|
|
|
|
|
|
BSYA | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 136, 106, 106, 5) |
| P | BSY Pump Station (P0, P1, P2, P3, P5) |
|
|
|
|
|
|
BSYB | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 136, 106, 106, 5) |
| P | BSY Pump Station (P0, P1, P2, P3, P5) |
|
|
|
|
|
|
BSYN | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 136, 106, 106, 5) |
| P | BSY Pump Station (P0, P1, P2, P3, P5) |
|
|
|
BSYS | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 136, 106, 106, 5) |
| P | BSY Pump Station (P0, P1, P2, P3, P5) |
|
|
|
LTU0 | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 5 or 911) |
|
|
|
LTU1 | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 105 or Bldg 406 or |
| P | Pump Line |
|
| Bldg 911 or Bldg 912 or Bldg 913) |
|
|
|
MCC0 | E | Equipment Rack Area (Bldg 5) OBSOLETE |
---|
| C | Control Room |
|
|
|
UND1 | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg 913,921) |
|
|
|
DMP1 | B | Beam Line |
---|
| E | Surface Equipment Building (Bldg B921) |
|
|
|
FEE1 | B | Beam Line |
---|
|
| Hard (High-energy) through Branch (South) to Hutch 3 and beyond |
| 1 | Soft (Low-energy) Branch (North) to Hutch 1 |
| 2 | Soft (Low-energy) Branch (Middle) to Hutch 2 |
| E | Equipment Rack Alcove or Surface Equipment Building (Bldg 940) |
|
|
|
NEH1 | B | Beam Line |
---|
|
| Hard (High-energy) Branch (South) to Hutch 3 and beyond |
| 1 | Soft (Low-energy) Branch (North) to Hutch 1 |
| 2 | Soft (Low-energy) Branch (Middle) to Hutch 2 |
| E | Surface Equipment Building (Bldg 950) |
|
|
|
XRT1 | B | Beam Line |
---|
|
| Through Branch |
| 4 | North Branch to Hutch 4 |
| 5 | Middle Branch to Hutch 5 |
| 6 | South Branch to Hutch 6 |
| E | Surface Equipment Building (Bldg 960) |
|
|
|
FEH1 | B | Beam Line |
---|
| 4 | North Branch to Hutch 4 |
| 5 | Middle Branch to Hutch 5 |
| 6 | South Branch to Hutch 6 |
| E | Surface Equipment Building (Bldg 999) |
XT01 | B | Beam Line |
|
| Surface Equipment Building (Bldb 062) |
SYS0 |
| LCLS-I System |
---|
SYS1 |
| FACET and FACET-II System |
---|
SYS2 |
| LCLS-II System |
---|
SYS3 |
| LCLS-III System |
---|
SYS4 |
| NLCTA System |
---|
SYS5 |
| SPEAR System |
---|
SYS6 |
| X-Band Test Area |
---|
SYS7 |
| ASTA Test Area |
---|
SYS8 |
| Klystron Test Lab (B44) |
---|
SYS9 |
| Site - HE Cryo Test Facility (IR4,etc), Radiation Monitoring outside gate |
---|
SYSW |
| Global System West |
---|
SYSE |
| Global System East |
---|
GLB0 |
| Global to all Machines |
---|