Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemRelated LinksNotes

15 min

Controls DR Recommendation Responses

https://app.smartsheet.com/reports/5QG4h4wQRRRJ32GVXR3wHr6Hc2Qx33fmG8mJH951

  • FY24-DR-14
through 
  • through FY24-DR-17
25

45 mins

MEC-U Controls FMEA

  • Amir and Kai to explain FMEA process for MEC-U
  • Continue brainstorming FMEA failures. If no additional comments, move to mitigations or send for review and move onto next discussions. 

If time

permits 

permits *Moved Offline

EPICS Archiver/DAQ

  • What type of data is LLNL hoping to capture with EPICS archiver? 
  • What does LLNL want to do with the data? 
    • Answering will help to start determining what solution can be made to meet LLNL's needs. 
  • Proposal of proof of concept for archiver: 

    "This should be at 10Hz, and running a standard GigE Vision configuration (5 cameras per host)".

  • Related ticket
    Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-14
  • Chris also has a DAQ proposal for MEC-U. Time stamping so that data can be pulled into DAQ whenever needed. 

*Moved Offline


5 mins

Review Jira Ticket Updates

  • New tickets:
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-
26
  • Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-24
  • Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-23
  • Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-22
    • Identify new Jira tickets and call for prioritization. 
    • Marked top priority items as critical. 
    • Mitchell Cabral will begin trying to tie due dates to each ticket. 
    • New ticket created to go over installation plan and phasing. 
  • Please enter any additional tickets as necessary. 
  • Reconfigured Jira board to order swimlanes by priority. 
      • 29

    Next Meeting

    Date

    Objectives


    Action Items:

    Task report