Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Attendees:


Meeting Agenda

Excerpt

Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemRelated LinksNotes

15 min

Controls DR Recommendation Responses

https://app.smartsheet.com/reports/5QG4h4wQRRRJ32GVXR3wHr6Hc2Qx33fmG8mJH951

  • FY24-DR-14 through 

25 mins

MEC-U Controls FMEA

  • Amir and Kai to explain FMEA process for MEC-U
  • Continue brainstorming FMEA failures. If no additional comments, move to mitigations or send for review and move onto next discussions. 

If time permits 

EPICS Archiver/DAQ

  • What type of data is LLNL hoping to capture with EPICS archiver? 
  • What does LLNL want to do with the data? 
    • Answering will help to start determining what solution can be made to meet LLNL's needs. 
  • Proposal of proof of concept for archiver: 

    "This should be at 10Hz, and running a standard GigE Vision configuration (5 cameras per host)".

  • Related ticket
    Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-14
  • Chris also has a DAQ proposal for MEC-U. Time stamping so that data can be pulled into DAQ whenever needed. 


5 mins

Review Jira Ticket Updates

  • New tickets:
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-26
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-24
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-23
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-22


  • Identify new Jira tickets and call for prioritization. 
  • Marked top priority items as critical. 
  • Mitchell Cabral will begin trying to tie due dates to each ticket. 
  • New ticket created to go over installation plan and phasing. 
  • Please enter any additional tickets as necessary. 
  • Reconfigured Jira board to order swimlanes by priority. 

Next Meeting

Date

Objectives


Action Items:

Task report
pages363433955
pageSize10

...