Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Excerpt

Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemLinksNotes

15 min

Laser DR Recommendation Responses

https://app.smartsheet.com/reports/5QG4h4wQRRRJ32GVXR3wHr6Hc2Qx33fmG8mJH951

  • Responses should be entered in the "Notes" section. 


5 mins

Review Jira Ticket Updates

  • New tickets:
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-26
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-24
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-23
    • Jira
      serverSLAC National Accelerator Laboratory
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyMECUCOLLEC-22


  • Identify new Jira tickets and call for prioritization. 


40 mins

MEC-U Controls FMEA

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyMECUCOLLEC-22


If time permits

EPICS Archiver


  • What type of data is LLNL hoping to capture with EPICS archiver? 
  • What does LLNL want to do with the data? 
    • Answering will help Zach to start determining what solution can be made to meet LLNL's needs. 
  • Proposal of proof of concept: 

    "This should be at 10Hz, and running a standard GigE Vision configuration (5 cameras per host)".

  • Related ticket
    Jira
    serverSLAC National Accelerator Laboratory
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyMECUCOLLEC-14

Next Meeting

Date

Objectives


 

  • Continue DAQ discussions.
    • If able, begin writing up some requirements on what the laser systems need. 
  • Chris has a proposal. 
IT Infrastructure Build Requirements Spreadsheet





...