...
8 cable connections:
- Water lines to/from chiller x2
- Glenair signal cable from flange to archon
- 1-to-3 breakout controls cable between CryoTel coldhead/flange and cryotel controller
- On the controller, one connection.
- On the coldhead/flange side, three connections: Two black connectors which go to coldhead, and one db9 connector that goes to the flange.
- Cable that goes from CryoTel controller to coldhead
- Cat5 from Archon controller to laptop
- RS232 to USB cable from cryotel controller (RS232) to laptop (USB)
- Trigger cable to bottom BNC port on Archon
...