  •  Need to add REF*239104 cavern ceiling to *40442 model
  •  access tunnel is missing floor outside of TAO
  •  chase occurrence properties in equipment platform
  •  add a wall along east end of RRL hall where vents are
  •  Work with LLNL on west wall beam transport to incorporate our models, not send their versions back to us.

Open Items from Previous Meetings

  •  There are two CF models in the top level model, Need to remove 4/25 model, keep 6-7-23
  •   Vacuum Lines need to be cleaned up
    •  
  •  Beam transport chamber is 1m into shield wall 
    •  
  •  Need to to update access structure model to new concept (even if it's a rough draft)
  •  Remove LLNL racks and replace with SLAC racks on equipment platform
  •  Cut top off South Equipment platform/vestibule wall
  •  Cut top off South Equipment platform/vestibule wall
  •  Add new South Equipment platform/vestibule wall 1' offset from north elevator face (wall for personnel exclusion, EMP shielding, not structural)
    •  
  •  Need to ask LLNL about portable HEPA:
    •  
  •  Figure out cable tray layout with new equipment platform rack layout:
    •  
  •  Auxilliary equipment platform layout needs to be cleaned up. Generic Boxes need to be vetted (long term task)
  •  Remove old air handler model in access tunnel:
    •  
  •  Deal with occurrence properties:
    •  
  •  Why are we working on these delay boxes? They are not needed for FES scope and this layout doesn't work for DMPL.
    •  
  •  Need to get rid of old yellow box AMICA stay clear models. Using DSG*39856 as baseline FES HELP model.
    •