Previous Meeting Notes: 2023-09-19 MEC-U Project Controls and Data Systems Team Meetings | Approx. Time | Agenda Item | Links | Notes |
---|
| | - DR Prep - Review FAC Recommendations, P6, and Worry List.
- 1.02 and 1.04 coordinate recommendations to address during DR.
- Are there gaps or inconsistencies in P6 schedule for control? Any issue in control worry list that still need to be addressed?
| FAC Recommendations Worry List P6 Schedule
| - The team has reviewed the worry List and P6 schedule a couple of weeks ago, but we would like to confirm all gaps and concerns have been addressed.
| | | - Check in on laydown slides.
- Expectation to have slides created and some of the title slides inputted.
- How should we split up presentation of control scope, schedule, and cost between Alex, Jing, Nate, Barry and Steven.
| Presentation Folder: SC-3 Controls and Data Systems DR Prep Site | - Check-in on status of laydowns and discuss the split of scope, cost, and schedule between each.
| | | - Continue DAQ discussions.
- If able, begin writing up some requirements on what the DAQ should provide to the laser systems.
| IT Infrastructure Build Requirements Spreadsheet |
| | | Objectives |
|
|
|
|
|
|
|
|
| |
|
|
|