Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Progress for the past week:
    1. Progress in getting the pulser system up and running at ASC - Xilinx cards have been flashed;
    2. Relative gain ratios;
    3. ACQ window increase testing;
    4. Gabriel's calibration method;
    5. any other business;
  2. Preparation for beamtimes:
    1. The following beamtimes have been approved:

      Camera testing

      Station

      Dates

      Objective

      ePix10ka small and 2M

      MFX

      13 and 15 July

      Verify we understand the checker mark problem with the ePix10k small and 2M.

      ePix10k smalls

      MFX

      July 21

      Retake the calibration data needed to come up with calibration constant for these cameras.

      ePixHR

      MFX

      Aug 29, Sept 14+15

      Evaluate the operation and performance of the ePixHR detector (ideally ASIC v4)

    2. Beamtime setup;
    3. DAQ scripts;
    4. Direct python visualization during beamtime;
    5. Oscilloscope setup;
    6. anything else?
    7. Initial ePixM test plan for the non-back-thinned and back-thinned prototypes. Test plan to be discussed can be found here: 1.4.8. Performance evaluation

...