Attendees: Alex Wallace Jing Yin Jessica Jimenez Terzi, Ken Vinod Gopalan Hill, Elizabeth Mitchell Cabral Gregory Brent Jason Bender Nate Landis,  Robert Plummer Tyler Johnson 

Action Items:

Task report
pages244915963

...

Common TopicsAgenda Item
Key Takeaways from LLE Visit - CosyLab Support
-Testing Environments - Servers, timing, etc. 

MECU RRL Plan
SLAC TopicsAgenda Item
Laser Naming Convention Update
LLNL high-level ICD update.
-Jama - LLNL Requirements 
-LLE Requirements

Next meeting topics
Moved OfflineAgenda Item
-Syslog in EPICS
-User Privileges for EPICS

Minutes:

Testing Environment Plan:

  • What test environment can SLAC provide to LLNL/LLE.
  • Performance Testing in test environment. 
    • Can still functionally test interfaces, but should have real capable hardware and networking to support this.  

Timing:

  • A stand-alone RF signal can be used to simulate an input into the timing system (Clock input).
  • Large discussion on timing. LLNL and LLE would like to have a lower-level timing presentation from SLAC.
    • Previous timing presentation was given by Charlie, but was high-level.
    • Aiming in advance of LLNL CDR (beginning of January)  
      • Target timeline will be week of (Tyler, feel free to adjust this date).
      • Tyler Johnson is working on organizing this presentation with hardware timing team.



        Discussion Topics for this presentation:
        Event (Course) Timing (LLE/LLNL)
        • Overall easier and minimal hardware
        • ~8 nanosecond triggers
        • ~10+ picosecond jitters 
        • Delivered optically over fiber (TPR - Timing Pattern Receiver directly outputs trigger)
        • High Precision Timing (LLNL)
          • Locking laser to RF
          • Custom supporting hardware
          • ~1 nanosecond trigger*
          • ~10 femtosecond jitter*
            • *In principle, system is still in development
        • Interface between timing and various systems.
        • Wiring and signals required.



      • See resources below to links to SLAC Laser/Timing confluence pages. 

        Image Added

        Interface between laser system and timing system.

IT/Servers:

  • Omar to put together an IT supported device list for Barry
    • EPICS environment needs to run services such as logging system and achiever. 
    • SLAC may provide a rack for LLNL, but this is still being worked out.
      • Half a rack dedicated to the core.
      • For event timing systems, there are various small PCIE cards scattered around.
      • Precision timing system is ~half rack. 
        • For precision timing we may need to consider optical timing as well.

Controls Requirements:

  • As we review requirements, we should think of who will be responsible and begin assigning roles.

LLNL: 

  • LLNL controls requirements inputted into Jama. 
  • Requirements are out to review for LLNL/SLAC.
  • Mitchell Cabral To ensure LLNL and LLE teams have Jama accounts/access.

LLE:

  • Still working on hardware list which will lead into system requirements. 
  • LLE will attempt to write requirements from a narrower view of the system. 

Resources:


Info
titleDated Resources

The following laser and timing resources are reflective of LCLS-I systems. LCLS-II upgrades are ongoing and not complete. Please view these sources with this information in mind. 

Action Items: