Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  Follow up with LLE and LLNL AHJ to connect with SLAC EEIP to hopefully get Ch8 requirements satisfied by local authorities, avoid having to redo EEIP upon arrival at SLAC. 
  •  Develop the ICD approver list, send out the preliminary draft to the collective for consideration Alex Wallace 

Past meeting AI

Task report
pages244915963