Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

No modifications were done or rework on towers during the beam test. During intergration in integration into the 1 x 4 grid one TKR connector (between flex cable 7 and the TEM) of non-flight TKR) was slightly offset and we added a connector saver to avoid stress in the cable.

...