Flight Hardware : TKR (FM8) & CAL (FM101) on bay 3 (close to the edge) and CAL (FM109) on bay 1.

Patrick will back-up all data from the computers. Reference runs for data taking were not linked because we are not connected to the farm (behind firewall).

No modifications were done or rework on towers during the beam test. During intergration in the 1 x 4 one TKR connector (between flex cable 7 and the TEM of non-flight TKR) slightly offset and we added a connector saver to avoid stress in the cable.

...

For charge injection runs, tests are self-contained and results labeled PASSED are indeed meaningful (we also inspected the reports). Charge injection tests are done one tower at the time.

For data taking tests we added a reference taken from the Beam Test at CERN (see below) because the PASS/FAIL condition is affected by how we treated the treat the well-known issue of TKR FIFO errors. Also configuration of the set-up may affect rates. So the figure of meirt for the data taking is that event rates are consistent with expectations

Jan will ask Patrick to back-up all data from the computers. Reference runs for data taking were not linked here because we are behind the firewall and it does not make sense to do all the work manually when the whole disk will be backed up.

TKR
  • Noise and gain measurement (TkrNoiseAndGain.py)
    • Reference run for the TKR module attached to TEM 3: run 700004421 (PASSED)
    • Reference run for the TKR module attached to TEM 2: run 700004435 (PASSED*)

...