Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Left pump port with 3/8" barb

High-Pressure Firm Polyurethane Rubber Tubing

ID:OD=3/8":5/8" Link

~1.5 m

316 Stainless Steel Push-on Hose Fitting for Air and Water

On/off valve

High-Pressure Compact 316 Stainless Steel On/Off Valve

with Lever Handle, 1/4 NPT Female x 1/4 NPT Male

1/4" Tee

316 Stainless Steel Threaded Pipe Fitting

Low-Pressure, Tee Connector, 1/4 NPT Female

Link

Plastic Barbed Tube Fitting for Air and Water

Swivel Adapter, for 1/16" Tube ID (1.6 mm)x 1/4 NPT Male

Link


cern tube

OD/ID=3mm/1.8mm

(~30cm)

default

default

default


default

to be connect to Remotely monitor vacuum:

default

Image Added

Dry Air

The dry air filters were saved by Matt from BaBar, residing inside the curtained area of B84 EPP lab. House compressed air are filtered to let out through the flow meter with a max flow of 20 ft3/min. A 80ft long hard polypropylene tubing with 1/4" OD (McMaster-Carr #9349T2) takes the drive air down to the ATLAS benches. The dry air supply tube terminates at a diverting valve (no shutoff) (McMaster #45165K42) on the bench to allow the switching of the dry air between a test port and the through path to module cooling unit. The through path continues with the same type of tube to transition to the 30cm long dry air tube into the module cooling unit which is an ID/OD=1.8mm/3.0mm blue tube from CERN shipment (same as the vacuum tube). This transition uses a similar strategy as the vacuum tubes, with a pair of Aluminum low-pressure 1/4 NPT adaptor to barbed tube fitting: 1/4" barb - male NPT (with O-ring) on supply side (McMaster-Carr #5058K441); 1/16" barb and female NPT on module side (McMaster-Carr #5058K641).

The initial turn on of dry air should let run for a few hours with the outlet going to the test port using the diverting valve. Check flow and humidity at the test port before flowing into the module cooling unit. Once on for operation, the dry air flow should not be turned off. From an off state, the restart should always have the few hours of initial flush first. During operations, if the dry air needs to be off at the module cooling unit, use the diverting valve to temporarily directing the air to the test port. 

...

long hard polypropylene tubing with 1/4" OD

11/64" ID, 1/4" OD

 Link

~ 80 ft

Diverting Valve with Yor-Lok Fittings

for 1/4" Tube OD, 316 Stainless Steel Body

Link

Aluminum Low-Pressure Barbed Tube Fitting

for Air and Water, Adapter for 1/4" Tube ID

x 1/4 NPT Male

Link


Aluminum Low-Pressure Barbed Tube Fitting

for Air and Water, Adapter for 1/16"(1.6mm) ID Tube x 1/4 NPT Female

Link

cern tube

OD/ID=3mm/1.8mm

(~30cm)

default

 

one to application/ one to testing area

default

Image Added

Peltier

  • Peltier: 4 sets to be tested:
  1.  2 layer peltier (recommend): Laird 108161050003 (53W) and Laird 387004685 (125W)
  2.  1 Layer peltier: Sheetak SKCM-240-11-T100-NS-TF00-ALO (75W)
  3. 1 Layer peltier: HP-199-1.4-0.8 (120W)
  4. 1 Layer peltier: HP-199-1.4-1.15 (175W)


Peltier TE-127-1.0-2.5: 

peltierLaird 387004685 (125W)HP-199-1.4-0.8 (120W)HP-199-1.4-1.15 (175W)
figureImage AddedImage Added
propertiesQmax 125 WQ max 120 WQ max 175 W
data sheetLinkLinkLink
measurements

Image Added

P~ 10W delta T =11 C (without load)

Image Added

P~9W delta T =12 C

P~20W delta T =15 C

Image Added

P ~ 6W  delta T = 6 C

P~ 17.5W delta T = 9 C


Preliminary Setup and Test Result

...