Schedule
Day/Week | Date | Activities | Program | ||
---|---|---|---|---|---|
Thursday-Saturday | Dec/6-8 | T577 stand alone running. Day shift AMO beam unusable. | |||
Sunday | Dec/9 | T577 running at 5 GeV | |||
Monday | Dec/10 | Day: T577 running at 3 changing energy to 8 GeV. | Night: T539 | also change energy toat 8 GeV | |
Tuesday | Dec/11 | Day: T577 running at 8 GeV. | Night: T539 (TBC)at 8 GeV | ||
Wednesday | Dec/12 | Day: T577 changing to 3 GeV until beam off 1pm | Beam off normally at 9am but may go until 1pm ? |
Main Goal
The Nov/2018 T539+T545 session had reduced beam time due to one primary LCLS experiment didn't permit the 5 Hz parasitic beam to ESTB. A makeup shared session was negotiated during this period with T577 (Moller calorimeter) also using secondary beam. The main goals of this test session:
...
2) An independent examination of the L1A time distribution with the SLAC HSIO2+FEB readout. Data taken so far with YARR all exhibited a very broad distribution.
Preparation
Caladium was moved into place at the start of T577 and remote driven to far wall with 1-2 inch clearance from beam line so that we can remote drive it back to beam line.
A97 had 1000e tuning from Timon on YARR during last period. Checked with RCE+FEB calibration looking OK
A97 | Thresholds | Noise map |
---|---|---|
YARR | ||
HSIO2+FEB |
B53 had brief tests by Aleksandra before sent to SLAC
B53 | Thresholds | Noise map |
---|---|---|
YARR | ||
HSIO2+FEB |
Installation Inventory
- RD53A module on DUT mounting frame
- FEB board + 12V supply
- DisplayPort cable
- Agilent LV supply with GPIB controller, LV cable to FEB. Ethernet cable to Fanless box.
- Keithley HV
- TLU box with its voltage supply
- Additional NIM discriminator from ESA for better trigger fanout cleanup + LEMO cables