- Started Run 751, -36C, Ileak=340uA. Moved Yfine up by 4mm but moved more like 8mm. This run covers X=(42 - 62). 12K events. The histogram save for this didn't work. I rushed starting next run before this was complete ?
- Started Run 752, -34C, Ileak=380uA. Move Yfine back -4mm to recover the last strip X=(30 - 50). 12K events.
- 17:20 MCC called asking to taking beam to full 120Hz to primary expt briefly. Ended run 752 with ~5K events. Missing saving histogram.
- 17:26 They returned faster than I thought. Run 753 continue with same setup as last run. End with 7.5K events.
- 17:52 Run 754: Yfine +4mm back to X=42-62 strip again. Ended wtih 9K events.
- 18:26 Run 755: Yfine +4mm to the final strip X>60. Ileak=480uA. Tgas=-31C.
- Access to swap in LUB2
- Operator told me no more beam after 9pm. LCLS going to low E.