Participants: 

LBNL: Katie Dunne, Timon Heim, Peilian Liu, Ben Nachman, Maurice Garcia Sciveres
SLAC: Nicole Hartman, Peter Kim, Martin Kocian, Rob Mina, Francesco Rubbo, Su Dong
ANL: Sergei Chekanov
KEK: Koji Nakamura 

Shift Schedule

DayShiftShifter
Thursday Sep/299am – 9pmSergei, Su Dong, Timon, Ben, Katie
Thursday – Friday9pm – 9amPeilian, Ben (->1am), Timon (->5am), Sergei (4am->)
Friday Sep/309am – 9pmSu Dong, Nicole, Sergei (->11am)
Friday – Saturday9pm – 9amTimon (->5am,10am->), Peilian, Rob (5am->)
Saturday Oct/19am – 9pmSu Dong, Rob(->10am), Ben (10am->), Timon(10am-2pm)
Saturday – Sunday9pm – 9amNo shift, LCLS at low energy. Ben and Su Dong switching cold->warm setup
Sunday Oct/2

9am – 9pm

Ben, Peter, Katie
Sunday – Monday9pm – 9amSu Dong, Nicole
Monday Oct/39am – 9pmFrancesco, Peter
Monday – Tuesday9pm – 9amBen, Rob
Tuesday9am – 9pmSu Dong, Peter, Rob
Wednesday10am-10pmMartin, Su Dong, Timon (remote)

Event Log

Sep/19-26 prep      

Sep/19: Previous dissembled Caladium is reassembled by Test Facility in the ESTB tunnel but parked on the side as beam pipe was reinstalled for a down stream experiment (somewhat of a surprise for us) this week. Caladium mover control electronics is still missing and to be installed next week. We checked the re-connections and found a few errors and missing links which got corrected. Connected the double chip module 94-04-03 as DUT with upgraded DUT CAT6 data cables and tried pixel digital calibration which worked as expected. Reordered the power supplies on the remote power strip to match the original panel in EPICS.     

Sep/20: Checking with Carsten about what is really going on this week, it turned out T-542 (sFlash) is taking the entire period Sep/22-Sep/26 so that the originally agreed Sep/26 for us has evaporated and we were never informed of that change. 

Sep/23: Checked with sFlash at ESA control room. The intense scene confirmed the fear that they will probably need the entire period, including Monday.

Sep/26: sFlash is continuing with their runs so that we are unlikely to have any chance to run for Monday, considering that Caladium still needs to be brought onto beam line after beam pipe removal. So Monday is expected to mainly doing lab test of the first RTI module to get proper configurations prepared and check other preparation items.   

Sep/27

Sep/28

Plan for today:

Activities:

Sep/29

Plan of the day:

Activities:

Sep 30

Oct/1

RunPositionComment
630Start positionspot (x=100-200, y=45-80)
631y+3 mmNo YARR
632y+2 mmNo YARR
633sameRetake with YARR (now in all subsequent runs).  Delta y (rows) = 0-100
634y-2 mmDelta Y = 50-150
635y-4 mmDelta y = 120-220
636y-4 mmDelta y = 220-300, Delta x = 45-80.  Stopped beam for RP to survey Koji's modules
637y-2 mmonly got 1000 events before the RCE gave up (wasn't quite to 2000 from 636 because it was stopped manually)
638same as 637X position is -67 mm
640x-4 mmHuge noise burst!  See the timing distribution in ./bin/run640.root
641y+4 mmno noise burst
642y+4 mmnoise burst
643same as 642noise burst
644y+2 mm 
645y+2 mm 
646x-2 mm 
647x-2 mmX position is -75 mm

Oct/2

 

 

 

Known LCLS development for XC119 to have 2nd pulse 122ns laterSingle pulse normally at =5. 5*25ns ~ 125ns.

 

Run 745 accumulated 3 movesRun 748Run 748

 

Oct/4

Oct/12 

The original event log for Oct/4 mislabelled the running RTI module as RTISC4A and even using the calibration directory and Run control config files names as RTISC4A but the actual module was RTISC2B. The notes in the Oct/4 event log were retroactively corrected.